Inspection of the Installation (Installation control)
The performance of the installation control is a multisided-operation, encompassing not only the pressure vessel itself, but also a check of the installation site, the pressure vessel armament with necessary fittings and pipelines.
Concerning the inspected pressure part itself, the installation control usually consists of checking the pressure vessel’s identity (name plate), inspection for any damage and a check of the existence of the required documents for its preparation, and the pressure vessel is duly stamped.
Installation control is made pursuant to the Order Chapter 4 and Annex 3 point 1 and WEA guides.